Monolithic four-storeyed administration building construction in Nizhny Novgorod
ending 10/30/2015
The professional employees of the construction company "Triumph" have started monolithic reinforced-concrete framing of administration building construction at address: Nizhny Novgorod, Usolskaya-Str., 30 (under the terms of general contracting)
Construction volume: monolithic reinforced-concrete framing of four-storeyed administration building, concrete pouring – 600 cu.m. As of the moment of beginning of works bored and cast-in-place piles and foundation frames have been installed
We have carried out the following kinds of work:
-
site engineering
-
sand mattress installation
-
installation of thermal insulation to foundation plate (winterization by Technoplex)
-
prefabricated reinforcement cage installation
-
slushing and foundation concrete slab pouring
-
pouring of metal deck slab of basement
-
in-situ concrete slab of entry level pouring
-
pouring of reinforced concrete columns of the second floor
-
monolithic reinforced-concrete stair flights installation
-
in-situ concrete slab of the second floor pouring
-
pouring of reinforced concrete columns of the 3rd floor;
-
reinforcing of intermediate concrete slabs of the 3rd floor
-
in-situ concreting is complete
-
exterior wall envelopes installation - breeze block walls
-
winterization of building face
-
finishing work is complete