Objects
Pile foundation construction for company Doorhan in Nizhny Novgorod
ending 01/15/2018
The professional employees of the construction company "Triumph" have started pile foundation construction for a warehouse made of light steel thin-walled structures at address: Nizhny Novgorod, 900 m eastward of the house 20 building 9 up the street Zaslonova on the 23rd of October 2017. Piles total is 164, volume of works is 120 cu.m.
The following kinds of work have been carried out:
-
installation of temporary access route to worksite
-
pile driving rig delivery. hook-up and start-up
-
top soil stripping
-
pile driving
-
installation of sand blanket to concrete bottom
-
foundation pouring
-
pile crushing
-
construction of formwork
-
frame to podium installation
-
anchoring accessories installation (preparation for mounting)
-
two-course overlay membrane waterproofing
-
earth backing with ramming by vibrating board
-
setting and detachment of cast formwork to foundation beam
-
reinforce framework installation
-
membrane waterproofing
-
ground movement
Work is now complete.
Photos of the work